Solar Installation Process
Reach out now.
Learn more about this process.
Learn more about our recommendations.
Property Inspection
To make sure you get the right solar system of your property, we start with a thorough inspection. We look at sunlight exposure, shade patterns, roof condition, and your typical energy user. This helps us understand your power needs and recommend the system size that will work best for you.
Using the results of our assessment, we design a custom solar energy system that fits your property and energy needs.
Equipment Recommendations
We recommend the Jinko JKM425N-54HL4-B solar panel for most applications. It features a black-on-black design, for an extremely sleek design, perfect for almost any aesthetic and is compatible with both residential and commercial applications.


Rated Power: 425W
Efficiency: 21.76%
Cell Type: N-type monocrystalline, 108 half-cut cells
Dimensions: 1722 × 1134 × 35 mm (67.79 × 44.65 × 1.38 inches)
Weight: 22 kg (48.5 lbs)
Frame: Black anodized aluminum
Backsheet: Black DuPont Tedlar
Connector: Staubli MC4
Max System Voltage: 1000V DC
Series Fuse Rating: 25A
Operating Temperature: -40°C to +85°C
Fire Rating: Type 1

Open-Circuit Voltage (Voc): 38.95V
Short-Circuit Current (Isc): 13.58A
Max Power Voltage (Vmpp): 32.37V
Max Power Current (Impp): 13.13A
Temperature Coefficient (Pmax): -0.29%/°C
Power Tolerance: 0~+3%

Product Warranty: 25 years
Performance Warranty: 30 years
Year 1 degradation: 1%
Annual degradation: 0.4%
Output at year 30: 87.4% of original capacity
Certifications: IEC 61215, IEC 61730, ISO 9001, ISO 14001, ISO 45001, UL 61730
System Installation
Certified, experienced professional installers mount the panels on your roof and connect them to your electrical system. An inverter is installed to convert solar power into usable electricity. After a final inspection and utility approval, the system is activated. Most installations are completed within one to three days, depending on system size and complexity.









